We’ve been working with Ingenuity for over a decade because their attention to detail, creativity, reliability, and transparency makes them a great building partner. Whether the challenge is big or small, Ingenuity has always been able to handle it and support us. When it came time to break ground on the Oak West Corporate Centre, we had no doubt that Ingenuity was the right constructor for the job and they did not disappoint. Oak West Corporate Centre has become an asset that Fengate and Ingenuity can both be very proud of.”
Oak West Corporate Centre, Phase I & II
Duration: Phase I: 4 years / Phase II: 3 years
Size: Phase I: 173,000 ft2 / Phase II: 540,000 ft2
At the heart of everything that we do at Ingenuity is building a collaborative relationship with our client centered on trust and being vigilant on all the details that are integral to each stage of a project. Having partnered with Fengate Asset Management on over a hundred projects, Oak West Corporate Centre set a new bar and we were delighted to work on both Phase I and II of this business park development.
The scope of this modern flex office and industrial space required a multi-year development plan and also multiple construction phases. Working closely with the Fengate team while keeping their market research, building needs, and goals in mind, we were able to navigate various challenges (i.e., unfavourable soil conditions) to transform what was once merely plots of barren land into beautiful, functional business parks for the tenants that will occupy this space.
As construction transitioned from exterior to interior, we continued to collaborate with the Fengate team and extended our relationship-building to their clients – the tenants. We ensured that the work of the interior fit-outs represented our shared values of high standards and quality craftsmanship.
Got a project? Let's connect!